Episode 7·October 14, 1993

The Belmont House - 7

Our host arrives to find the crew getting ready to frame up the gutted kitchen. First, though, the plumbing stack had to be moved; Richard Trethewey shows what's involved in such a project. Tom Silva explains how past work has compromised the framing system, and how he plans to insert a carrying beam and jack up the floor. Outside, homeowners Dean and Lauren strip the last bit of paint an oval window frame using a caustic paste. Dean shows our host newly discovered rot on the porch walls, and the two discuss the idea of putting wood shingles on the front slope of the roof. Dean visits a jobsite to see the details of shingling over an eyebrow window. The window crew begins refitting the old windows with insulating glass, and our host helps the crew put in the engineered lumber beam in the kitchen.

My Note

My Review

Reviews

KinowayKinoway

Track your favourite series, mark watched episodes and never miss a new release.

Account

About

Kinoway is currently in alpha. If you find bugs or have suggestions, please contact us.

TMDB

Data and images provided by TMDB. This product uses the TMDB API but is not endorsed or certified by TMDB.

© 2026 Kinoway. All rights reserved.

Privacy PolicyTerms of Use