Episode 3·January 28, 1994

The Acton House - 3

Homeowner Terry Maitland cuts down a tree to make way for the new foundation, while the crew lays out the excavation lines using a small laser level. Excavation contractor Herb Brockert arrives to dig, while out back the old septic field is expanded with a new tank and new leach lines. Inside, the guys review the demolition plans, pointing out the importance of not going beyond the planned areas of reconstruction. Architect Chris Dallmus guides us through a model of the new addition and discusses a possible window choice. Halfway through the excavation, Herb hits large boulders or ledge at about four feet, dashing the Maitlands hopes for a full basement.

My Note

My Review

Reviews

KinowayKinoway

Track your favourite series, mark watched episodes and never miss a new release.

Account

About

Kinoway is currently in alpha. If you find bugs or have suggestions, please contact us.

TMDB

Data and images provided by TMDB. This product uses the TMDB API but is not endorsed or certified by TMDB.

© 2026 Kinoway. All rights reserved.

Privacy PolicyTerms of Use