Episode 4·October 21, 1995

The Salem House - 4

On a hot July day, the crew got the existing children's bath and future master bath. They discover a flooring system that probably cna't support the heavy load of two bathrooms' worth of china and tile, and decide to beef it up before starting the rough plumbing. Up on the roof, mason Lenny Belleveau reflashes and repoints the chimneys, replacing a poorly built cricket and sealing it with a rubber membrane. Painting contractor Mike McManus powerwashes the building, and architecture students measure the building to prepare ""as-built"" drawings for the architects to use. Architect Pamela Hawkes visits the site and considers a suggestion of cutting through the house's rear ell with a porte cochere to gain access to the back yard and solve the parking problem.

My Note

My Review

Reviews

KinowayKinoway

Track your favourite series, mark watched episodes and never miss a new release.

Account

About

Kinoway is currently in alpha. If you find bugs or have suggestions, please contact us.

TMDB

Data and images provided by TMDB. This product uses the TMDB API but is not endorsed or certified by TMDB.

© 2026 Kinoway. All rights reserved.

Privacy PolicyTerms of Use