Episode 15·January 3, 1998

The Milton House - 15

The finishes have begun at the Milton project. We see the shellac and wax work painter John Dee is applying to the stripped old-growth white pine in the front wall - it now matches the look of the adjacement parlor. The crew directs a crane as it swings the new, 490-pound soaking tub through the master bath window. We visit the Wisconsin foundry where it was made. Meanwhile, tiling contractors the Ferrante brothers prepaer 16 x 16 limestone tiles for the bathroom floor using an extra-tile wet saw. Outside, our host meets a termite exterminator who uses an insect growth hormone bait to wipe out subterranean colonies. Upstairs, HVAC contractor Ken Winchester shows us the very important air-to-air heat exchanger, which introduces fresh air that picks up the house's exiting stale, damp air. In the courtyard, the new iron fountain has arrived, and the crew puts the finishing touches of the green lattice cedar fence. We meet Glenn Bowman, who is cutting and installing soapstone countertops i

My Note

My Review

Reviews

KinowayKinoway

Track your favourite series, mark watched episodes and never miss a new release.

Account

About

Kinoway is currently in alpha. If you find bugs or have suggestions, please contact us.

TMDB

Data and images provided by TMDB. This product uses the TMDB API but is not endorsed or certified by TMDB.

© 2026 Kinoway. All rights reserved.

Privacy PolicyTerms of Use