Episode 8·November 15, 1997

The Milton House - 8

Victory Garden chef Marian Morash and kitchen designer Phil Mossgraber work to refine a plan for the new kitchen, with special attention to window and appliance placement. Out in the workshop, T.J. Silva uses an airless sprayer to apply a stainkilling primer to the interior walls and ceiling, while the crew begin to apply the newly arrived shingle system: 2' x 8' panels, prestrained, with braided corner units that go up quick and cost less than uninstalled traditional shingles. Security system consultant Steve Yusko shows us the wireless radio transmitter that will link the property's alarms with a central monitoring station, redundant with the regular phone link. In the media room, a/v expert Steve Hayes pulls speaker wires and adjusts the rooftop DSS (digital satellite system) dish to pull in a clear signal. Finally, lighting designer Josh Feinstein gives a tour of the many lighting control options available for the new house.

My Note

My Review

Reviews

KinowayKinoway

Track your favourite series, mark watched episodes and never miss a new release.

Account

About

Kinoway is currently in alpha. If you find bugs or have suggestions, please contact us.

TMDB

Data and images provided by TMDB. This product uses the TMDB API but is not endorsed or certified by TMDB.

© 2026 Kinoway. All rights reserved.

Privacy PolicyTerms of Use