Episode 9·November 17, 2001

The Manchester House - 9

Steve sees the progress on the new addition, including a roof joist system of 1 x 12 LVLs, necessitated by the room's high ceiling height. Inside, Tom and our master carpenter show him how they are stiffening up a bouncy third floor by sistering 1/8"" steel sheets to the floor joists from below. Richard Trethewey checks out a software program that computes heat loss for our building, as well as projecting heating and cooling costs with various insulation, window, and power plant configurations. One remarkable finding: with the current, inefficient heating plant and standard insulation and double-pane windows operating costs for 30 years would be around $220,000; with expanded-foam insulation, low-e windows, and super-high-efficiency heating equipment the cost would be $75,000. Our master carpenter takes viewers to Portland, Oregon, where a couple has turned passion for period-perfect Victorian restorations into a fledgling business. Finally, the first of the new sliding glass glass door

My Note

My Review

Reviews

KinowayKinoway

Track your favourite series, mark watched episodes and never miss a new release.

Account

About

Kinoway is currently in alpha. If you find bugs or have suggestions, please contact us.

TMDB

Data and images provided by TMDB. This product uses the TMDB API but is not endorsed or certified by TMDB.

© 2026 Kinoway. All rights reserved.

Privacy PolicyTerms of Use