Episode 3·October 23, 2004

A Different Kind of Barn Raising - The Carlisle House

Kevin finds Roger clearing land for a much-needed job site parking lot. Architect Jeremiah Eck walks Norm and Kevin through a 3-D model of his proposed design. Highlights include dramatic reuse of the existing timberframe barn as a ""living hall,"" an updated floor plan incorporating the kitchen and dining room in the new connecting ell, and an addition containing a generous master suite. Tom brings in a barn jacking crew to lift the 65-ton barn two feet off the ground so his crew can repair the foundation and replace the first floor deck. Demolition contractors arrive to knock down the failing ell, which will be rebuilt using structural insulated panels.

My Note

My Review

Reviews

KinowayKinoway

Track your favourite series, mark watched episodes and never miss a new release.

Account

About

Kinoway is currently in alpha. If you find bugs or have suggestions, please contact us.

TMDB

Data and images provided by TMDB. This product uses the TMDB API but is not endorsed or certified by TMDB.

© 2026 Kinoway. All rights reserved.

Privacy PolicyTerms of Use