Episode 12·December 22, 2005

Cambridge | Dramatic Staircase

Host Kevin O'Connor arrives to find exterior coatings specialist Dan Rourke and his crew applying the EIFS finish coat. Custom pool specialist Bob Snay installs a black pebble finish on the bed of the new water feature. Inside, general contractor Tom Silva oversees the installation of the steel stairs. Kevin visits the custom metal shop that fabricated the steel as well as the dramatic bronze "wishbone" balustrade that will be installed later on the job. Reclaimed wood specialist Richard McFarland shows Kevin samples of reclaimed wood from all over the world as Tom's crew installs exterior redwood siding harvested from giant olive casks. Plumbing and heating expert Richard Trethewey gives Kevin an update on the mechanicals — the new boiler has arrived, radiant panels are installed underneath the first floor, and PEX water supply lines have been run.

My Note

My Review

Reviews

KinowayKinoway

Track your favourite series, mark watched episodes and never miss a new release.

Account

About

Kinoway is currently in alpha. If you find bugs or have suggestions, please contact us.

TMDB

Data and images provided by TMDB. This product uses the TMDB API but is not endorsed or certified by TMDB.

© 2026 Kinoway. All rights reserved.

Privacy PolicyTerms of Use