Episode 17·January 26, 2006

Cambridge | Things Are Coming Together

With only a week left on the project, master carpenter Norm Abram finds general contractor Tom Silva at work on the dramatic 3-story stair. With the teak treads and bronze balustrade finally in, Tom can work on installing the teak handrail. Audio/visual specialist Dan Chadwick shows host Kevin O'Connor how he's concealing a 61" plasma TV in the living room, and adding acoustical panels to enhance the sound in the room. Designer Todd Tsiang shows Kevin the modern fireplace mantle, tile, plumbing fixtures, and the fully decorated master suite. Tom reveals the private roof deck off the master bedroom as a new modular steel railing system is installed. Landscape contractor Roger Cook visits a 500-acre sod farm in Rhode Island to see how sod is grown and harvested. In the wet bar, tile contractor Joe Ferrante shows Norm a "bubbly" glass tile being installed on the backsplash.

My Note

My Review

Reviews

KinowayKinoway

Track your favourite series, mark watched episodes and never miss a new release.

Account

About

Kinoway is currently in alpha. If you find bugs or have suggestions, please contact us.

TMDB

Data and images provided by TMDB. This product uses the TMDB API but is not endorsed or certified by TMDB.

© 2026 Kinoway. All rights reserved.

Privacy PolicyTerms of Use