Episode 20·February 16, 2006

Washington, DC | Setbacks Open Up New Ideas

Host Kevin O'Connor visits the National Mall to see how the National Park Service is finishing up nearly 10 years of renovation at the Lincoln Memorial. Back at the project house, master carpenter Norm Abram finds the house has been almost completely gutted. General contractor Mahyar Mahvi had hoped to save many of the floors, studs, millwork, and plaster—but water damage had ruined them beyond salvage. In the basement, the news is better—a new slab has been poured, electrical service has been updated, and the new water service is underway. Out at the street, master plumber Robert Major replaces the 3/4" lead water-service pipe with 1" copper tubing. Up on Capitol Hill, landscape contractor Roger Cook meets garden designer Kevin Cordt to see how he designs beautiful, low-maintenance urban gardens on small rowhouse lots. Surprised by the radical changes at the jobsite, architect Genell Anderson has no choice but to go back to the drawing board.

My Note

My Review

Reviews

KinowayKinoway

Track your favourite series, mark watched episodes and never miss a new release.

Account

About

Kinoway is currently in alpha. If you find bugs or have suggestions, please contact us.

TMDB

Data and images provided by TMDB. This product uses the TMDB API but is not endorsed or certified by TMDB.

© 2026 Kinoway. All rights reserved.

Privacy PolicyTerms of Use