Episode 7·November 13, 2008

Weston; Modular Rooms

Two weeks into the new house raising, master carpenter Norm Abram meets architect Chris Adams for a tour of the first and second floors. At the Bensonwood shop in Walpole, New Hampshire, plumbing and heating expert Richard Trethewey meets plumbing contractor Lynne Keating to see how she is running PEX water supply lines and ABS drainage pipe to the back-to-back kids bathrooms, both of which are assembled in the shop as one pre-built "module". Back in Weston, to keep pace with the fast building schedule, landscape contractor Roger Cook is already working on building the landscape plan. It calls for an elaborate drainage plan with a rain garden on the tail end to help protect the wetlands from surface runoff and contaminants. Homeowner Pete Favat and his daughter Juliette lend a hand building the rain garden and planting it with native plants and seeds.

My Note

My Review

Reviews

KinowayKinoway

Track your favourite series, mark watched episodes and never miss a new release.

Account

About

Kinoway is currently in alpha. If you find bugs or have suggestions, please contact us.

TMDB

Data and images provided by TMDB. This product uses the TMDB API but is not endorsed or certified by TMDB.

© 2026 Kinoway. All rights reserved.

Privacy PolicyTerms of Use